Hilton Head Preparatory School

When Hilton Head Preparatory School began construction of their new million dollar field house, selecting the telephony and network integrator that could handle the project was a critical choice. After a formal review process, Progressive Technology was hired perform the work.

Progressive was charged with installing the entire infrastructure and providing connectivity from the athletic ceneter to the main building. The entire project last several months.